Field note

ACH580 BACnet MS/TP Setup and Troubleshooting

The BAS graphic shows the supply fan drive online on Monday and offline on Tuesday. Or the drive shows online, the graphic says the fan is commanded on, and the fan sits still. The controls contractor and the drive tech each say the other side is wrong. These calls usually come down to an address, a wire, or a setting nobody wrote down. An ACH580 has BACnet MS/TP built in, so the drive side takes a few minutes when the job is planned and a few hours when it is not.

This note covers ABB’s standalone ACH580 on BACnet MS/TP. For the general causes of drive communication faults on any brand, see VFD communication faults.

Get the address schedule first

Before you touch the drive, get the controls contractor’s address schedule for the trunk. You need four things for each drive:

SettingWhat it isThe rule
MAC address (station or node address)The drive’s address on this wireUnique on the wire, and 0 to 127 for a device that passes the token
Device object IDThe drive’s identity on the whole BACnet networkUnique across every BACnet device in the building
Baud rateThe speed of the trunkThe same for every device on the trunk
Max masterThe highest master address each device polls when it passes the tokenEvery master’s address has to be at or below it

If there is no schedule, make one and give it to the controls contractor. Do not leave any device on a default address. ABB’s troubleshooting note lists defaults such as 0, 1, 127 and 254 as a common source of trouble. The ACH580’s BACnet default MAC address is 254, which is outside the 0 to 127 range where MS/TP masters live, so a drive left at its default does not take part in token passing at all.

Wire the trunk

MS/TP runs on RS-485, wired as a daisy chain from device to device. On the standalone ACH580 the trunk lands on terminals X5:29 to X5:31, and two DIP switches, S4 and S5, handle termination and bias. Check the terminal markings in the manual for polarity.

  • Polarity. The A(-) and B(+) terminals have to match all the way through the chain. A reversed pair can knock out one device or everything downstream of it, depending on where it is.
  • Cable. Twisted pair. ABB notes three wire cable, a twisted pair plus a reference conductor, is the current standard for some protocols. Land the reference conductor the same way at every device, and keep 2 wire and 3 wire runs separate back to the controller.
  • Shield. Ground it at one end only, preferably at the supervisory controller.
  • Termination. Turn the terminator on only at the devices at the two physical ends of the trunk.
  • Bias. ABB says the ACH580’s transceiver is internally biased, and older devices on the same trunk may need bias. Follow the trunk design from the controls contractor and check the bias switch on each drive against it, because too much bias causes problems too.
  • Device count. ABB’s guidance is to plan no more than 32 devices on each segment. Treat that as a conservative design number.

Keep the trunk out of the motor cable tray. A comm cable sharing a tray with drive output cable is the first thing to look for when the errors are random.

The settings that matter on the drive

ABB recommends that technicians new to the drive use the primary settings menu for BACnet setup rather than going parameter by parameter. Either way, these are the settings:

  1. Protocol. Select BACnet MS/TP as the embedded fieldbus protocol.
  2. MAC address. From the schedule, within 0 to 127.
  3. Device object ID. From the schedule. The default, 4194303, means uninitialized, and discovery tools treat it that way.
  4. Baud rate. The default is autodetect. ABB prefers setting it by hand when the trunk’s baud rate is known, and if the trunk rate is ever changed, autodetect has to be selected again. BACnet defines the character format as 8 data bits, no parity, 1 stop bit.
  5. Max master. The default is 127, the highest allowed. If the controls contractor lowers it to speed up the trunk, every master has to have an address at or below it.
  6. Max info frames. The default is 1. Leave it unless the controls contractor asks for something else.

On a standalone ACH580, applying the settings from the primary settings menu, or refreshing the fieldbus settings, puts them into effect without a power cycle. Applying settings to the fieldbus and saving the parameters are separate steps, so save the parameter set once the drive works.

Point the control source at the fieldbus

This is the step that gets missed. Turning on BACnet lets the drive talk. It does not tell the drive to take its start command or its speed reference from the BAS. Those come from the drive’s control source settings, and on a new drive they point at the terminals and the keypad.

If the start command and the speed reference are not set to the embedded fieldbus, the drive sits online, answers every read, accepts the BAS writes, and ignores them. The graphic says the fan is commanded on, and the fan does not move. The keypad matters too: Hand on the ACH580 keypad takes control from the BAS, and Off stops the drive.

Decide with the controls contractor whether the BAS controls the drive, or only monitors it while start and speed stay hardwired. The ACH580 supports both. Write the choice on the start-up record, set the control source to match, and check the reference scaling while you are there. A BAS writing a percentage and a tech expecting hertz will argue about the same number.

Set the communication loss action

When the BAS stops talking, the drive does what it was told to do ahead of time. The ACH580 can take no action, fault, hold its last speed, go to a safe preset speed, or give a warning. The default timeout is 30 seconds.

Check what resets that timer. It can be any message addressed to the drive, or only a write of the control word or a reference. With the second choice, a BAS that keeps reading status but seldom rewrites the start command or the speed can trip comm loss on a network that is working fine. That is a different problem from a broken wire, and the counters below will show the trunk is healthy.

There is no single right action. A fan holding a hospital space pressure may need to hold last speed. An exhaust fan may need to stop. Get the answer from the sequence of operations or the engineer, set it, and test it.

Check every point

With the drive on the trunk, check each point the points list calls for:

  • From the BAS: start, stop and a speed command. Watch the drive’s keypad respond.
  • From the drive: actual speed, run status, current, kW, fault, and Hand/Off/Auto status. Compare each value at the BAS with the keypad at the same moment.
  • Test the comm loss action with the owner’s agreement and the fan in a safe condition: break communication in a controlled way, watch the drive do what it was set to do, restore it, and confirm the drive returns to BAS control.

ABB’s firmware manual has the drive’s BACnet object list. Use it with the controls contractor so the points list matches the objects the drive actually has.

Troubleshoot by the symptom

The ACH580 keeps diagnostic counters and a status word for the embedded fieldbus. The status word flags specific errors such as an address configuration problem, a parity or baud mismatch, no bus activity, noise, comm loss and a duplicate Device ID. The counters show whether a problem is getting worse. Start from what the BAS is doing.

SymptomLikely causesCheck
Never discoveredDevice object ID at default, MAC address outside 0 to 127 or above Max master, duplicate address, wrong baud, A and B reversedToken counter: if it is not climbing, the drive is not getting the token. Then the status word and the address schedule
Drops offline now and thenInterference, a loose termination, too many devices on the segmentCRC errors climbing point to interference: shield grounding, reference conductor, cable near motor leads. Isolate a section at the end and add devices back one at a time
Online but will not run or change speedControl source still on terminals or keypad, keypad in Hand or Off, reference scalingThe control source settings and the keypad mode, before the network
Trips or warns on comm loss with a working trunkThe timer only resets on control writes, and the BAS seldom writes themWhat resets the timer, and how often the BAS writes the command and reference
Errors climbing from the startConfigurationUART errors climbing point to addresses, baud rate, polarity or bias settings

After each fix, watch the counters again. A CRC count that stops climbing after you move the shield ground tells you the fix worked. When the counters do not settle it, a packet capture shows what is on the wire. MS/TP is RS-485, so a PC needs an MS/TP capture interface or a suitable gateway before a tool such as Wireshark can see the traffic.

ACH580 parameter reference

These numbers are from ABB’s ACH580 HVAC control program firmware manual, Rev J, for a standalone drive. Check them against the manual for the firmware in your drive. The E-Clipse bypass uses its own numbering.

ParameterSettingWhat to set or read
58.01Protocol selectionBACnet MS/TP
58.03Node addressMAC address from the schedule, 0 to 127. BACnet default is 254
58.04Baud rateTrunk baud rate. Default is autodetect
58.05Parity8 NONE 1 for BACnet MS/TP
58.06Communication controlRefresh to put new settings into effect
58.07Communication diagnosticsStatus flags for the embedded fieldbus
58.11UART errorsClimbing count points to configuration
58.12CRC errorsClimbing count points to interference
58.13Token counterShould climb steadily on a working trunk
58.14Communication loss actionWhat the drive does when the BAS stops talking
58.15Communication loss modeWhich messages reset the comm loss timer
58.16Communication loss timeComm loss timeout. Default is 30 s
58.40Device object IDUnique building-wide. Default 4194303 is uninitialized
58.41Max masterHighest master address polled. Default is 127
58.42Max info framesDefault is 1
20.01Ext1 commandsEmbedded fieldbus, with 20.02 Ext1 start trigger type set to Level
20.06Ext2 commandsEmbedded fieldbus, if EXT2 is used
22.11Ext1 speed ref1EFB ref1, when the drive runs a speed reference
28.11Ext1 frequency ref1EFB ref1, when the drive runs a frequency reference
96.07Parameter save manuallySaves the settings to permanent memory

If there is an E-Clipse bypass

ABB’s BACnet setup note for the drive covers ACH580 drives and packages without an E-Clipse bypass. With an E-Clipse bypass, the bypass controller is the communication proxy for the package, and the setup changes:

  • All of the BACnet configuration is done from the E-Clipse control panel, not the ACH580 panel, with the bypass’s own parameter numbers.
  • The BAS can see the drive node, the bypass node, or both. Seeing both is possible on MS/TP only. Find out which one the job was set up for before mapping points.
  • On MS/TP, the bypass needs a power cycle to save changed communication settings.

The note on ACH580 vs ACS580 covers what else the bypass adds.

Before you leave the site

Confirm the token counter is climbing and the error counters are holding steady. Write down the MAC address, Device object ID, baud rate, Max master, the control source, the comm loss action and timeout, and what resets the timer. Save the parameter set and a backup file. Give the address schedule to the controls contractor and the owner. The HVAC VFD commissioning checklist covers the rest of the start-up.

The ACH580 BACnet setup, step by step on a real drive with the parameters, is in the ABB 580 start-up class at The Tolbert School. The HVAC drives guide covers what the drive controls on each load.

Frequently Asked Questions

What settings does an ACH580 need for BACnet MS/TP?

Select BACnet MS/TP as the embedded protocol, then set the MAC address (unique on that wire and within the master range), the Device object ID (unique across the whole building network), the baud rate, and Max master. Then point the drive's start command and speed reference at the embedded fieldbus, or the drive will be online and ignore the BAS. Set the communication loss action and timeout before handover.

Why can't the BAS find my ACH580 on BACnet?

Check the Device object ID first. Its default, 4194303, means uninitialized and has to be changed. Then check the MAC address: the BACnet default of 254 sits outside the 0 to 127 range a master uses, so a drive left there never takes the token. After that, look for a duplicate address, an address above Max master, A and B swapped in the daisy chain, or a baud rate that does not match the trunk.

Why is my ACH580 online but not running?

Usually because the drive's start command or speed reference is still set to come from the terminals or the keypad instead of the embedded fieldbus, or because the keypad is in Hand or Off. The drive answers BACnet reads and accepts writes, and does nothing with them. Check the control source settings and the keypad mode before chasing the network.

How many devices can be on a BACnet MS/TP segment?

ABB's guidance is to plan no more than 32 devices on each MS/TP segment. That number comes from traditional RS-485 loading, and the ACH580 uses a half-load transceiver, but 32 is the conservative planning number.

Where should the shield of an MS/TP cable be grounded?

At one end only. ABB's RS-485 guidance says to terminate the shield to ground at one end, preferably at the supervisory controller.

Online start-up courses, filmed on real drives

One drive per course, filmed uncut with a clock on screen from first power to a saved backup. The install course is free, and the ABB ACS380 and ACS580 start-up course is open now.

See the online courses

Wayward Leaders® is a veteran-owned VFD training practice. We teach maintenance teams and plant electricians to install, commission, and troubleshoot variable frequency drives correctly.

Every class ends with a scored competency assessment. The plant gets a way to prove what each technician can do, not a roster of who sat in the room.

The instruction is field-trained. It is drawn from nearly 8,000 VFD, power, and motor documents and from more than 750 commissioned drives captured through personal field experience and data collection. Carl Lee Tolbert, PhD, CMRP, and ATD Master Trainer™, leads it. He has delivered more than 5,000 hours of VFD instruction across 30 years and trained 8,000 industrial professionals, from International Paper to the U.S. Navy.

The premise is simple: VFDs do not fail. Installations fail them. The curriculum is built backward from that.

Installation, commissioning, troubleshooting, and fault diagnosis guides are published openly at waywardleaders.com.