Field note

What Is a CRAH Unit? A Drive Tech's Look Inside

A CRAH (computer room air handler) cools a data center by pulling room air across a chilled water coil. Unlike a CRAC, it has no compressor. The cold comes from a chiller plant, and the CRAH runs a chilled water valve and its fans, on EC motors or VFDs. The part a drive tech has to get right is what happens after utility power drops. The generator transfer gets power back. The restart sequence gets cooling back. Test both.

The CRAH explainers that rank today stop at the cabinet door. This note is the view from inside it: what spins in there, who controls it, and the settings that decide whether the room gets its air back after a power loss.

CRAH vs CRAC

CRAHCRAC
Where the cold comes fromChilled water from a central plantIts own compressor and refrigerant circuit
What it modulatesChilled water valve and fan speedCompressor capacity and fan speed
Heat rejectionAt the central plant, depending on plant designA remote condenser, or a water or glycol loop
What has to restart after a power lossThe fans and valve here, and the chilled water plant behind itThe fans, and the compressor with its own restart timers

A CRAH is the common choice on larger sites with a chiller plant. A CRAC is more self-contained and shows up in smaller rooms and older sites. From the drive side the fans behave the same way in both. The difference after a power loss is the compressor: a CRAC’s compressor usually has minimum off and restart delays that can add minutes before it cools again.

What spins inside a CRAH

Open one up and there are three things a drive tech cares about.

The fans. Usually two to four plug fans, or a centrifugal blower on older units. They run on EC motors or on induction motors with a VFD. The unit controller sets fan speed to hold supply plenum static pressure, the pressure difference across a contained aisle, or an air temperature, depending on how the room was designed.

The chilled water valve. It sets how much cooling the coil does. Fan speed and valve position are linked in the unit’s controller, so a bad fan speed setting shows up as bad cooling even when the valve and the water are fine.

The unit controller. On a Vertiv Liebert unit it is the iCOM, and other makers have their own. The controller owns the start command, the fan speed command, how the units in a room work together, and what happens after a power loss. The fan drive or the EC motor follows it.

Behind the CRAH sits the plant. Depending on the design that means chilled water pumps, condenser water pumps, cooling tower fans or dry coolers, and the chillers, some with their own compressor drives. The CRAH depends on that plant, and on many sites the plant is where the VFDs are. The HVAC drives guide and the note on chilled water and condenser water pump VFDs cover that side.

EC fan or VFD

EC fans are taking over in CRAHs. Vertiv sells its Liebert EC fan upgrade as adjustable fan speed with no VFD, and lists a soft start with inrush below full load current for that product. The inverter lives in the motor, the maker owns the electronics and the bearing protection, and the unit controller sends it a speed signal.

That does not take the drive tech out of the room. Older CRAHs still run belt driven blowers on VFDs, plenty of retrofits keep the original motor and add a drive, and fan walls are often built with one VFD per fan on induction or PM motors. Many of the pumps and fans in the plant are on drives too. If you work data centers, you will work both, and the restart questions below apply to EC fans and VFDs alike.

Fan walls

Bigger air handlers often use a fan wall: a grid of small direct drive fans in place of one or two big ones. The question is one drive per fan or one drive for the array. NIH’s design standard for its own buildings is a useful precedent here, even though it is written for labs and not data centers. It calls for one VFD per fan, never one drive running several fans in an air handler, with an isolation damper on each fan to stop it spinning backward when it is off. It also limits direct drive fan motors on VFDs to 90 Hz and recommends staying at or under 30 HP per fan. Where the fans and air handlers are redundant, NIH says VFD bypass is neither justified nor required.

One drive per fan means a failed drive takes out one fan, and the rest of the wall can cover it if the array was sized and commissioned to run that way. One drive per array means a failed drive takes out the whole wall, which is hard to accept in a room that cannot lose cooling.

After utility power drops

This is where the commissioning time pays off.

NFPA 110 classifies an emergency power supply system by Type and Level. Type 10 means the transfer switch load terminals can be without acceptable power for no more than 10 seconds. Level 1 is about the consequences of a failure, for systems where a failure could cost lives, not about speed. Not every data center cooling load sits on a Level 1, Type 10 system, so find out what the site actually has. As one maker’s illustration of how 10 seconds gets used, Cummins shows up to 1 second to sense the outage, up to 8.5 seconds for the generator to start and come up, and up to 0.5 seconds for the transfer switch.

Unless the fans and pumps are on UPS power, the cooling stops for that gap. ASHRAE’s TC 9.9 says a cold aisle temperature rise of 30°C (54°F) in as little as 5 minutes is not uncommon once cooling fails. How fast a given room heats depends on its load, its containment and its backup. The point is that the room’s thermal margin has to cover the whole recovery of usable cooling, not just the transfer.

Some high tier sites put the CRAH fans and chilled water pumps on UPS power so they never see the gap. On those sites the restart chain below still matters for anything that is not on UPS, and for the chillers.

Don’t count on ride-through to cover the transfer

HVAC drives from the major makers have some form of power loss ride-through. The drive uses the energy in the spinning fan or pump to keep its DC bus up through a short dip. Yaskawa rates the HV600 for up to 2 seconds of ride-through, with an add-on momentary power loss unit needed on the smaller models to get there. Danfoss’s FC 102 has kinetic back-up, which keeps the drive running as long as there is energy in the system and restores operation when the mains return. ABB’s 580 drives call it undervoltage control.

Those ratings come with the maker’s conditions, and they are written for utility blinks. A coasting CRAH fan does not hold enough energy to keep a drive running through a transfer that can take up to 10 seconds. Plan on cooling drives losing power during a transfer and having to restart. Ride-through still earns its place for the dips that never become a transfer.

The restart chain

When acceptable power is back, cooling comes back only if every link in this chain does its job.

  1. The unit controller restarts on its own. On the current Liebert iCOM, automatic restart after power failure is its own setting, Auto Restart Enable, with a delay in seconds after it. Older Liebert microprocessor controls handled it differently: a restart delay of zero there meant manual restart, and the unit waited for someone to press the button. Know which controller and which version you are looking at, then check the setting on every unit. A standby CRAH that has not run in a year is exactly the unit where a wrong restart setting hides until the first outage.
  2. The drive restarts on its own. There are two different ways a drive gets back to running. On ABB’s ACS580 standard program, automatic restart covers a power failure of up to 10 seconds, and that window includes the DC precharge time after power comes back. It only works with the drive’s control board on external 24 V, and that 24 V has to come from a source that stays up through the outage, such as a UPS or a DC system. Without it the control board shuts off and the drive does a full reboot when power returns. After a reboot, ABB says the drive starts on its own if the external run command is on, the drive is in remote, and the start signal is level triggered. A 10 second transfer is the most the system is allowed, and the drive’s window has to fit inside the real outage plus precharge, so do not count on the auto restart window alone. The ACH580 runs ABB’s HVAC control program with its own parameters and defaults, so check its manual separately, and check other brands in their own firmware manual at the revision you have.
  3. The drive catches a spinning fan. After a few seconds of coasting the fan is still turning. The drive needs flying start, which Yaskawa calls speed search, turned on so it locks onto the turning fan instead of tripping on overcurrent or overvoltage. ABB says flying start needs accurate motor nameplate values, which is one more reason the nameplate entry at start-up matters. On a fan wall, a failed isolation damper can let the neighbors windmill a stopped fan backward, so the flying start has to handle reverse rotation or the fan has to stop before the drive starts it.
  4. The run command comes back. This is where jobs go wrong. A drive can ride through, restart and catch the fan perfectly and still sit there stopped, because the run command dropped out. A main contactor or bypass contactor opened during the outage. A BMS start relay lost its coil power. A three wire start circuit needs a new start pulse that never comes. ABB’s manual says a drive with a main contactor needs a hold circuit, such as a UPS, to keep the contactor closed through a short supply break. Trace the run command from the source to the drive terminal and find every device that drops out when the power goes away.
  5. The restarts follow the planned order. A large data center may run fifty or more VFDs on its cooling. All of them starting on the same second is a big load step for a generator that just came online. Liebert’s controls sequence the loads inside each unit with a short delay, and Liebert suggests giving each unit in a room a different auto restart time. The plant needs the same thinking, and the chilled water pumps have to be running before the CRAH valves can do anything. The design engineer sets the order, and the drive tech makes sure every drive takes its slot.

Two more things can stop the chain. A VFD with a diode front end does not care if the generator’s phase rotation differs from the utility’s, but across the line loads do, and that includes any motor running in bypass. And the return to utility is a second event. An open transition retransfer interrupts power again, so the whole chain has to survive that too. A closed transition transfer switch avoids the second interruption on retransfer and planned tests, but it does nothing for the gap on an unexpected utility loss.

The chillers are the slow part

The fans and pumps can be back in seconds. The chillers take minutes, and the makers measure it differently, so read each number on its own terms. Trane says its Rapid Restart takes a chiller above 80 percent capacity at about 160 seconds after power returns, and about 15 minutes in its comparison without Rapid Restart. York says its YZ magnetic bearing chiller can restart in as little as 26 seconds after a 15 second outage and return to its pre-outage capacity in 2 minutes and 9 seconds, with the times depending on the chiller and the outage. Thermal storage, such as a chilled water tank, covers that gap on sites that have it. On sites that don’t, the CRAH fans move air across a coil that is warming up until the plant catches up.

That is why no drive should add delay beyond its planned slot in the restart order. A drive sitting stopped and waiting for a manual reset takes time the room does not have.

Test it the way it will happen

The test that proves the restart chain is a planned loss of normal power: utility opened, generator picks up the load, every CRAH, fan, pump and chiller expected to come back on its own. Do it under an approved commissioning procedure, with authorized electrical people doing the switching, and with abort criteria agreed before anyone touches a breaker. On data center jobs it is usually part of the integrated systems test at the end of commissioning.

Before that, prove the pieces one unit at a time, under the same kind of procedure. Check the controller’s auto restart setting, the drive’s restart and flying start settings against the firmware manual, and the run command circuit. Then do a planned loss of power on one running unit and watch it come back.

Judge the full test by whether airflow, chilled water flow and usable cooling came back inside the site’s acceptance limits, not only by whether the equipment restarted. And keep the drive tech on site for any unit that does not come back.

N+1 is a capacity rule

N+1 means the room has one more unit of capacity than the load needs. How that spare is run is a control choice, and sites do it both ways. Some rooms run every unit at part speed and share the load, so when one drops the others speed up to cover it. Others hold one unit in standby and start it when a running unit fails. Vertiv’s iCOM supports both, with teamwork, standby and rotation between units.

Either way, every unit has to be set and tested to do its job when a neighbor fails. A load sharing unit has to carry the higher speed inside its motor and drive ratings. A standby unit has to start on command, and after a power loss, which is why its restart settings deserve the same check as the running units.

That is also why bypass shows up less in data centers than in office buildings. ABB says the redundant drive effectively replaces the bypass in today’s redundant drive systems. A bypass runs the motor across the line at full speed, which upsets the room’s pressure control and hits a generator with inrush. The field note VFD Bypass vs N+1 runs the reliability numbers.

Before you leave the site

On every CRAH and every cooling drive behind it, record:

  1. Whether the fans are EC or VFD, and which device sends the run and speed commands.
  2. The unit controller’s model and version, its auto restart setting and its restart delay.
  3. The drive’s automatic restart setting and window, flying start and ride-through, checked against the firmware manual at the installed firmware revision, and what the drive does after a full reboot with the run command on.
  4. Where the restart depends on the drive’s control board staying powered, the source of that 24 V and proof that it stays up through an outage.
  5. Every device in the run command path that drops out on power loss, and how it gets the run command back.
  6. The restart order and delay for this unit in the room’s sequence, including what has to be running before it.
  7. Speed limits, ramps, and that the unit can do its job when a neighbor fails, whether it runs load sharing or standby.
  8. The result of the planned loss of power on this unit, and later whether airflow, chilled water flow and cooling recovered inside the site’s acceptance limits on the full transfer and the retransfer.

Ride-through, flying start and auto restart setup on the ACH580 is covered in the ABB 580 start-up class at The Tolbert School. The data center drives guide covers the rest of the drive work in a data center.

Frequently Asked Questions

What is a CRAH unit?

A computer room air handler. It cools a data center by pulling room air across a chilled water coil and pushing it back to the cold aisle or the supply plenum. It has no compressor. The cold comes from a chiller plant, and the unit controls a chilled water valve and the speed of its fans.

What is the difference between a CRAC and a CRAH?

A CRAC has its own compressor and refrigerant circuit, like a big precision air conditioner. A CRAH uses chilled water from a central plant and has no compressor. Both move room air with fans, and the fans face the same restart questions after a power loss. A CRAC also has compressor restart timers that a CRAH does not.

Does a CRAH unit have a VFD?

Some do. New CRAHs and many fan upgrades use EC fans, where the speed control is built into the motor and no separate drive is needed. VFDs stay common on older units, on fan walls with induction or PM motors, and on many of the pumps and fans in the plant that feeds the CRAH.

What happens to data center cooling when the power goes out?

Unless the cooling equipment is on UPS power, it stops. Getting power back is the first step. Then the unit controllers, fans and pumps have to restart in the intended order, and the chilled water plant has to come back to usable capacity. UPS backed equipment, stored chilled water and the plant's restart sequence decide how much cooling the room has while that happens.

How fast does a data center heat up when cooling stops?

It depends on the room, the IT load and what backup the cooling has. ASHRAE's TC 9.9 says a cold aisle temperature rise of 30°C (54°F) in as little as 5 minutes is not uncommon once cooling fails. That is why the restart after a power loss has to be automatic and tested.

Online start-up courses, filmed on real drives

One drive per course, filmed uncut with a clock on screen from first power to a saved backup. The install course is free, and the ABB ACS380 and ACS580 start-up course is open now.

See the online courses

Wayward Leaders® is a veteran-owned VFD training practice. We teach maintenance teams and plant electricians to install, commission, and troubleshoot variable frequency drives correctly.

Every class ends with a scored competency assessment. The plant gets a way to prove what each technician can do, not a roster of who sat in the room.

The instruction is field-trained. It is drawn from nearly 8,000 VFD, power, and motor documents and from more than 750 commissioned drives captured through personal field experience and data collection. Carl Lee Tolbert, PhD, CMRP, and ATD Master Trainer™, leads it. He has delivered more than 5,000 hours of VFD instruction across 30 years and trained 8,000 industrial professionals, from International Paper to the U.S. Navy.

The premise is simple: VFDs do not fail. Installations fail them. The curriculum is built backward from that.

Installation, commissioning, troubleshooting, and fault diagnosis guides are published openly at waywardleaders.com.