Field note

VFDs on Generator Power: Sizing, Filters and Transfer

Drives run well on generators when three things hold. The generator is sized for the drives’ harmonic current, not just their kW. Its voltage regulator can see through a distorted waveform. And no filter or power factor capacitor sits on the generator at light load without a way to switch it out. Get those right and the transfer between utility and generator becomes a question of restart settings and timing.

This note covers standby and prime power for any drive job: wells and lift stations, irrigation, ag sites on rental sets, hospitals and schools on emergency power, and data center cooling. Hospital essential electrical systems carry more requirements under NEC 517, NFPA 99 and NFPA 110 that this note doesn’t cover. The physics of why a generator turns the same drive load into more voltage distortion, and what IEEE 519 says about an islanded building, are in the note on VFD harmonics on generator power and BMS comm loss.

Why a generator is different

A generator is a soft source. Its subtransient reactance is commonly somewhere around 10 to 25 percent on the generator’s own kVA base, which is often small. A utility transformer’s impedance is commonly around 5 or 6 percent on a much larger base. So the same harmonic current makes far more voltage distortion on the generator, and the same load step makes a deeper dip. A generator’s soft source causes four problems with drives:

  • Distortion lowers the drive’s DC bus and heats the alternator. A flat-topped voltage wave charges the bus capacitors to a lower peak. Cummins says larger alternators are needed to keep the harmonic currents from overheating them.
  • Distortion confuses the voltage regulator. Cummins says waveform notching can make the SCR in the regulator switch off at the wrong time, so the exciter gets too little energy to hold voltage, and that notches can add false zero crossings and cause incorrect frequency sensing and a false overspeed fault.
  • Capacitors push it into leading power factor. Filter and power factor capacitors at light load make the load leading, and a generator can only carry a little leading kVAR before it loses voltage control.
  • Drives hold power constant. While a drive is regulating speed and inside its current limit, it draws more current as voltage sags, which makes a generator’s voltage and frequency dip deeper on a load step.

Sizing the generator

The makers use different bases and don’t agree on one number, so read each rule on its own terms:

  • ABB: 2 to 2.5 times the drive kVA for 6-pulse drives, 1.5 to 2 times for regenerative active front end drives, and 3 times for DC drives. ABB calls these a general guide and says to have the generator supplier do the real sizing.
  • Eaton: a generator of two to three times the rated power of the load will normally do, with the higher end for drives with less DC bus capacitance. Eaton says never to match the generator’s rated output to the drive’s input power rating. It also cites a common rule of thumb that nonlinear load should not be more than 20 percent of the generator’s stated capacity.
  • Cummins: VFD loads should be under about 50 percent of generator capacity to limit total harmonic distortion to less than 15 percent. That 15 percent is distortion at the generator, which is what the generator can stand. A UPS, electronics or other drives on the same bus may object well below it. Separately, Cummins says shunt and excitation boost alternators can handle about 25 percent of their base rating as nonlinear load before distortion becomes excessive.

Those rules are on different bases (drive kVA, load power, generator capacity, alternator rating), so they don’t collapse into one range. The practical answer is that the generator supplier sizes it, with the drive load, the harmonic mitigation and the other loads on the set all entered. Everything else on the set counts: other drives, a UPS, power factor capacitors, across-the-line motors and elevators.

A drive can also save generator size. Kohler’s case study needed a 700 kW generator to start a load across the line and 500 kW with the same load on drives. And where a drive has an across-the-line bypass, the generator may have to start the motor in bypass, which is a much bigger load than the drive.

The alternator and its regulator

Ask the generator supplier what excitation the alternator has, because it decides how well the set handles drives.

  • Shunt and excitation boost. The exciter is fed from the main output, so the distortion on the output reaches the regulator. That is where Cummins puts the roughly 25 percent nonlinear limit.
  • PMG. Cummins says the permanent magnet generator output is isolated from the disturbances on the main output, so nonlinear loads have no impact on its ability to power the exciter.
  • Auxiliary winding. Cummins says waveform distortion from nonlinear loads will not affect regulator performance on this design.

Cummins adds that PMG or auxiliary excitation gives the regulator cleaner input power, but distorted voltage sensing can still cause problems with an SCR type regulator, and that an FET type regulator using PWM avoids those issues. So the questions for the generator supplier are the excitation type, the regulator type, and how the regulator senses voltage.

Reactors, filters and the capacitor rule

AC line reactors and DC chokes. ABB’s typical figures put a 6-pulse drive at 90 to 120 percent input current THD with no reactor, and 35 to 45 percent with a 3 to 5 percent DC choke or AC reactor. Those are drive input current figures, not generator voltage distortion. The two devices are not the same on a generator. A DC bus choke, built into a lot of drive models, cuts harmonics without adding the same voltage drop on the AC side. An AC line reactor adds series impedance to an already soft source, and Eaton’s generator note says not to place a line reactor on the incoming supply to the drive for that reason. Other designs use one. Either way, a reactor or choke alone is usually not enough when drives are a big share of the generator. Run the harmonic study on generator power and let it decide.

Other options. ABB lists typical input current THD of 10 to 12 percent for 12-pulse, 5 to 6 percent for 18-pulse, 5 to 10 percent for a passive filter, 4 to 7 percent for an active filter, and 3 to 5 percent for an active front end ultra-low-harmonic drive. A multi-pulse drive does well on one large drive but needs balanced voltage and load to deliver its numbers, and a generator is more likely than a utility transformer to supply unbalanced voltage, so don’t take the catalog figure as the generator case. An active filter only helps the generator while the filter is running, so ask what the generator sees if the filter trips or is out for service.

The capacitor rule. A passive harmonic filter has capacitors, and at light load those capacitors make the load leading. This is where the filter makers are blunt:

  • TCI, in a 2015 note, said all passive filters on the market then exceeded generator reverse kVAR limits at no load. It expresses the limit as filter capacitance per HP of drive: 0.12 kVAR per HP as an absolute limit and 0.06 kVAR per HP as a conservative rule of thumb, and says a contactor must be used to keep the capacitors offline during light drive loading. Its figures line up with a generator’s reverse kVAR limit when the generator is sized at about 1 kVA per drive HP, so treat them as a screening check. TCI notes some makers hold a generator to about 10 percent of its kVAR capability as leading kVAR.
  • Danfoss says to always use a capacitor disconnect on its advanced harmonic filters in generator applications, because the capacitive current can cause generator overvoltage at no load and light load. Its contactor disconnects the capacitors at loads below 20 percent, and at no load the capacitors produce leading current of about 25 percent of the filter’s rated current.
  • MTE recommends a low kVAR filter, about 15 percent of its kW rating, and its capacitor contactor option picks up at 35 percent and drops out at 20 percent of filter current. MTE also says to start linear loads first, then the filtered drives. What does that job is lagging reactive load, like running motors, which absorbs some of the filter’s leading kVAR.

Filters are not the only capacitors on the bus. Power factor correction capacitors and the input filters on some UPS systems can also be capacitive at light load. The criterion is net leading kVAR at the generator terminals inside the generator supplier’s limit at every operating point, including no load, during transfer and after the drives shut down. Get there with the filter maker’s approved capacitor disconnect or another documented design.

The isolation transformer question

You will hear that a drive on a generator needs an isolation transformer. The reactor and filter makers’ published guidance doesn’t tie the two together. What is in print is about grounding and isolation, not generators:

  • A reactor is not isolation. Rockwell says a reactor does not fix grounding issues or provide isolation, cannot take the place of an isolation transformer, and that where isolation is needed, an isolation transformer is the answer.
  • Ungrounded and high-resistance-grounded supplies. Drive makers have settings for these: EMC filter screws, an RFI filter switch or an MOV jumper that lifts the drive’s filter capacitors from ground. Lifting them protects the drive on an ungrounded or high-resistance-grounded source and changes its EMC performance on a grounded one. If the transfer changes the grounding, for example solidly grounded on utility and high resistance grounded on the generator, confirm with the drive manual that the chosen setting is permitted on both sources.
  • Generator grounding. Neutral switching, source bonding and ground fault sensing are one coordinated design. With a 4-pole transfer switch the generator is a separately derived system with its own neutral bond at the set. With a 3-pole switch the generator neutral is not bonded at the set, and the service bond serves both sources. The rule is one bond per source system. Cummins says to use a 4-pole switch where ground fault sensing is required or may be required in the future, and warns that two bonds can leave ground fault protection unable to sense all of the fault current, with possible nuisance trips during generator exercise.

So an isolation transformer is a grounding and isolation tool. If the generator is an ungrounded or high-resistance-grounded source, or the job needs isolation for another reason, it may belong there, but the reason is the grounding, not the generator.

The transfer between utility and generator

When the transfer method matters. On an unplanned outage, the gap is set by the engine starting and the switch transferring, often several seconds and up to 10 seconds on an NFPA 110 Type 10 system. The transfer method (in-phase, delayed or closed transition) matters most on the retransfer back to utility, on tests and on planned transfers, when both sources are live.

What the drive cares about. A diode front end doesn’t carry the residual voltage hazard of a motor running across the line, so a drive doesn’t need an in-phase transfer the way a motor does. What it needs is either a gap shorter than its ride-through or a clean restart after a longer gap, with input equipment that suits a fast transfer. Ride-through is short. It depends on load: at full load with no kinetic buffering it may be only a few cycles, and it stretches at light load or with kinetic backup turned on. Yaskawa rates the HV600 for up to 2 seconds with an add-on momentary power loss unit on the smaller models. So on a typical generator transfer the drives lose power and restart.

What a motor in bypass cares about. A motor running across the line, including one in a drive’s bypass, is a different load. Closing it back in while its residual voltage is out of phase with the new source is the hazard. ASCO’s options for motor loads include in-phase monitoring that transfers between two live sources when they are nominally 60 degrees or less apart, delayed transition that leaves the load disconnected from both sources for a set time, closed transition with an overlap typically under 100 milliseconds, and motor load disconnect contacts that drop motor controls before the transfer and let them restart after. A drive’s inverter isolates its motor from all of this. A bypass motor isn’t isolated.

A bypass that trips in. A drive fault or phase loss trip caused by a supply disturbance can drop a drive with automatic bypass into an across-the-line start, on a generator that may never have been sized for it. Check how the automatic bypass is set to respond to supply faults.

A practical default. On a bus with drives and across-the-line or bypass motors, delayed transition is the usual choice. Set the off time from the motors’ residual voltage decay, the transfer switch maker’s guidance and how long the process can stand the interruption. Closed transition avoids the gap on planned transfers and retransfers, but needs the utility’s permission and does nothing for an unplanned outage.

Power-up limits. An outage and its open transition retransfer cause two power-ups, and tests, aborted transfers and retries add more. Drive makers limit how often the input can be switched on, because each power-up charges the DC bus through the precharge circuit. ABB’s drive manuals say no more than five power-ups in ten minutes. Danfoss rates the FC 102 at two a minute up to 7.5 kW, one a minute from 11 to 75 kW, and one every two minutes at 90 kW and up. Yaskawa’s GA700 manual says not to energize and de-energize the drive more often than once every 30 minutes. Set the transfer switch’s retransfer and test delays so it cannot chatter past those limits.

Restart settings, and where the makers disagree. ABB, Danfoss and Yaskawa all build ride-through, flying start and automatic restart into their drives for exactly this situation. Eaton’s generator note takes the other side for drives sharing a generator: it says to try to avoid auto start on power up, because it causes several drives to start at once, and to avoid auto reset and ride-through on mains loss. Eaton recommends powering up and starting drives one at a time, largest first, and not connecting a bank of drives to the generator through one switch.

Both positions are protecting against the same thing, a generator that sees every drive at once, and there are two separate things to stage:

  • Motor load. A post-transfer or sequencing output from the transfer switch wired into each drive’s run enable brings the motors on in steps.
  • Precharge. Staging the run commands does not stage the DC bus precharge if every drive’s input is energized at the same instant. Eaton’s advice against feeding a bank of drives through one switch is about that.

Use automatic restart only where the process and the personnel safety design allow it, stagger both, and prove it with a real transfer.

Load acceptance on a generator

When a block of load hits a generator, its voltage and frequency both dip before the engine and regulator recover. A drive holding speed draws more current as voltage drops, which deepens the dip, and on a marginal set it can stall the engine. Some drives offer an underfrequency response, a generator mode or a power limit function for this. Check whether the drives on the job have one and turn it on where the drive and the application support it. Also check each drive’s undervoltage trip level against the set’s load acceptance dip, so a normal block load doesn’t trip the drives.

Overvoltage and regen on a generator

Load rejection. When a generator drops a large block of load, its voltage jumps before the regulator catches it. ISO 8528-5 class G3 allows a voltage rise of up to 20 percent on 100 percent load rejection, with recovery in 4 seconds. That is an allowance, not a prediction, and a given set may do better. As an illustration, assuming a sinusoidal waveform: on a 480 V set, 20 percent high is about 576 V, and the crest of that is about 815 V, which a lightly loaded diode front end drive’s DC bus will approach. That can sit close to the overvoltage trip on some 480 V drives. Trip levels are drive specific, and a drive trips in milliseconds at the start of the transient, without waiting for the 4 second recovery. Check the drive’s trip level against the generator’s transient rating, and expect a lightly loaded drive to be the one that trips when the set dumps a big block.

Regen. A generator cannot take power back the way a utility can. Generator sets often carry a reverse power relay set at a few percent of rating, and a trip there drops the whole bus. Beyond that, the engine can absorb only a little motoring power before it overspeeds. The fix depends on the drive:

  • A diode front end cannot return energy to the bus at all, so a drive on an overhauling load or a hard stop needs a braking chopper and resistor.
  • An active front end can push energy back onto the bus, and that should be limited or turned off while on generator power.

Fire pumps

NFPA 20 sets its own rules for variable speed fire pumps, and they reach the generator. In the 2019 edition, section 4.8 requires self-regulating variable speed fire pump units to have a minimum of 5 percent line reactance on the input, an across-the-line fire pump controller, and an automatic bypass. Section 10.10.3.5 requires a restart delay so the motor de-energizes first when the controller is switched from variable speed to bypass under manual selection. The code requirement for line reactance governs on those units, whatever a generator note says about reactors, so check starting voltage with the reactor in circuit.

On the electrical side, NEC 695.7(A) limits voltage drop during motor starting to 15 percent, with exceptions where a successful start is demonstrated on the standby generator, including a start in bypass on a variable speed controller. That limit often drives the generator size more than anything else here, and it has to hold with the generator already carrying its other loads when the fire pump is called. Size for the bypass start. Section numbers move between editions, so check the editions your authority having jurisdiction has adopted.

Prime power and remote sites

On prime power the generator runs all the time, and oversizing for harmonics fights a different problem: underloading. Caterpillar says standby and prime rated diesel sets are designed to run at 50 to 85 percent of nameplate, that running below 30 percent for extended periods harms the unit, and that the fix for long light load operation is a minimum of 30 percent load for about 30 minutes for every four hours of light load. The sign of trouble is wet stacking, a black oily leak from the exhaust joints.

That makes harmonic mitigation worth more on prime power. A low harmonic drive, or a 6-pulse drive with a switched passive filter, can let the site run a smaller set closer to its design load, which saves fuel and avoids wet stacking. Price the mitigation against the generator upsize it avoids before choosing.

Well pumps on a generator

Submersible pump systems have their own generator rules. Franklin Electric says the generator must deliver at least 65 percent of the motor’s nameplate voltage during starting, to always start the generator before turning on the motor and turn the motor off before shutting down the generator, and not to use a reduced voltage starter with a minimum sized generator. Franklin’s reduced voltage starter section covers autotransformer, solid state and wye-delta starters, and it treats drives in a separate section with its own generator sizing method for Franklin’s drives. The note on VFD for pumps and well pumps covers the rest of the well drive setup.

Before the drives go on generator power

  1. Get the generator’s kW and kVA ratings, subtransient reactance, excitation type and regulator type.
  2. List everything else on the set: other drives, UPS, power factor capacitors, across-the-line motors, elevators.
  3. Have the generator supplier size it with the drive load and harmonic profile entered, and keep the rules above as a check.
  4. Run the harmonic study for the generator case, not just the utility case, and design to the weaker of what the generator and the connected equipment can stand.
  5. Keep net leading kVAR at the generator terminals inside the generator supplier’s limit at every operating point, including no load, during transfer and after drive shutdown, with the filter maker’s approved capacitor disconnect or another documented design. Count UPS input filters and power factor capacitors.
  6. Check what the generator sees if an active filter trips or is out for service.
  7. Verify neutral switching, source bonding and ground fault sensing as one coordinated design. Confirm the drive’s EMC filter, RFI switch or MOV setting is permitted on both sources.
  8. Pick the transfer method for the motors on the bus, and set the off time from residual voltage decay, the switch maker’s guidance and the process.
  9. Set ride-through, flying start and automatic restart on purpose, where the process and safety design allow, and stagger both the run commands and the input energization.
  10. Check that an automatic bypass cannot throw a motor across the line during a supply disturbance unless the design means it to.
  11. Check each drive’s power-up limit against the transfer switch timing.
  12. Check for a generator mode, underfrequency or power limit function on the drives, and each drive’s undervoltage trip against the set’s load acceptance dip.
  13. Plan for regen and load rejection overvoltage: braking on diode front end drives, regen limited on active front end drives, and the reverse power relay setting.
  14. Fire pumps: size for the bypass start, check starting voltage drop with the line reactance in circuit, and confirm with the authority having jurisdiction.
  15. Prime power: check the minimum load so the set does not wet stack.
  16. Witness a real utility to generator to utility transfer at start-up, with a power quality meter on the generator bus. Record generator bus voltage, frequency and voltage THD, and drive faults and restart order on both the transfer and the retransfer. Where the commissioning plan permits, test light load filter behavior and a representative load rejection separately.

Drive setup for ride-through, restart and flying start on the ABB 580 drives is covered in the ABB 580 start-up class at The Tolbert School. Other brands handle these differently, so check the manual for the drive on your job. The water and pump drives guide and the data center drives guide cover two of the applications where this comes up.

Frequently Asked Questions

How big a generator do I need for a VFD?

Bigger than the drive, and the makers do not agree on one number or even one basis. ABB's general guide is 2 to 2.5 times the drive input kVA for 6-pulse drives. Eaton says a generator of two to three times the rated power of the load will normally do, and never to match the generator's rated output to the drive's input rating. Cummins says VFD loads should stay under about 50 percent of generator capacity to hold distortion at the generator under 15 percent. Have the generator supplier do the real sizing with the drive load and its harmonic mitigation entered.

Should I put a line reactor on a drive running from a generator?

Separate the AC line reactor from the DC choke. A DC bus choke, built into a lot of drive models, cuts harmonics without adding the same voltage drop on the AC side. Eaton's generator note says not to place an AC line reactor on the incoming supply, because it adds impedance and voltage drop to an already soft source, while other designs use one. Either one alone is usually not enough when drives are a big share of the generator, and the harmonic study on generator power decides. Fire pumps are the exception, because NFPA 20 calls for line reactance on some variable speed fire pump units.

Can a harmonic filter hurt a generator?

A passive filter can. Its capacitors draw leading current at light load, and a generator can only carry a small amount of leading kVAR before it loses voltage control. Danfoss says to always use a capacitor disconnect on its filters in generator applications, and TCI says a contactor must keep the capacitors offline at light drive load. The check is net leading kVAR at the generator terminals against the generator supplier's limit, at no load, during transfer and after the drives shut down.

Do I need an isolation transformer for a VFD on a generator?

Not because the power comes from a generator. Isolation transformers are a grounding and isolation tool. Rockwell says a reactor does not fix grounding issues or provide isolation, and that an isolation transformer is the answer where isolation is needed. A generator that is ungrounded or high resistance grounded raises the same grounding questions any ungrounded supply does.

What kind of transfer switch is best for VFD loads?

For a bus with drives and bypass or across-the-line motors, delayed transition is the usual default: the load sits disconnected from both sources long enough for motor residual voltage to decay. The off time comes from the motors' residual voltage decay, the transfer switch maker's guidance and how long the process can stand the interruption. On an unplanned outage the gap is set by engine start and transfer anyway, so the transfer method matters most on retransfer, tests and planned transfers. Check each drive's power-up limit against the switch's timing.

Online start-up courses, filmed on real drives

One drive per course, filmed uncut with a clock on screen from first power to a saved backup. The install course is free, and the ABB ACS380 and ACS580 start-up course is open now.

See the online courses

Wayward Leaders® is a veteran-owned VFD training practice. We teach maintenance teams and plant electricians to install, commission, and troubleshoot variable frequency drives correctly.

Every class ends with a scored competency assessment. The plant gets a way to prove what each technician can do, not a roster of who sat in the room.

The instruction is field-trained. It is drawn from nearly 8,000 VFD, power, and motor documents and from more than 750 commissioned drives captured through personal field experience and data collection. Carl Lee Tolbert, PhD, CMRP, and ATD Master Trainer™, leads it. He has delivered more than 5,000 hours of VFD instruction across 30 years and trained 8,000 industrial professionals, from International Paper to the U.S. Navy.

The premise is simple: VFDs do not fail. Installations fail them. The curriculum is built backward from that.

Installation, commissioning, troubleshooting, and fault diagnosis guides are published openly at waywardleaders.com.