Field note

VFD Harmonics on Generator Power and BMS Comm Loss

The same fan and pump drives that behave on utility power can push a generator’s voltage distortion several times higher, because a generator is a much weaker source. And when the BMS network goes quiet, a cooling drive has to keep doing its job. The two problems meet at a generator transfer: the drives power up just as the step load hits, and the BMS controllers and network switches may still be rebooting. This note covers what drives do to a generator, what IEEE 519 does and doesn’t say about it, and how to set and test what a drive does on comm loss.

Why the same drives are worse on a generator

A 6-pulse drive draws current in pulses. Its harmonic current changes only somewhat with the source: a softer source usually lowers a 6-pulse drive’s current THD a little. What changes a lot is the voltage distortion that current produces, and that depends on the source impedance. Cummins puts it as voltage THD equals a factor times current THD, where the factor reflects the source impedance, and for a generator it uses the subtransient reactance in that analysis.

Cummins shows one modeled case on a slide from a data center generator specification talk. A 6-pulse rectifier load drawing 29 percent current THD makes about 2.8 percent voltage THD on a stiff transformer, and about 34 percent voltage THD on a generator with 12 percent subtransient reactance. That is about twelve times the voltage distortion from the same load. The slide does not spell out how heavily the rectifier load loads the generator, and that matters as much as the reactance, so treat it as an example of the effect and not a prediction for a job.

That distortion lands on everything else on the bus: the UPS, the other drives, the controls, and the generator’s own voltage regulator. ABB’s generator sizing note says drive harmonics can cause problems for a generator’s voltage regulation circuits, and it says digital regulators are usually more responsive and may need more oversizing than analog ones. That is ABB’s position in that note, and generator makers may see their regulators differently, so ask the generator supplier. Cummins says harmonic distortion does not affect alternators with a separate excitation system, such as a permanent magnet exciter, the way it affects self excited ones. Separate excitation protects the regulator. It does not take the distortion off the bus.

What IEEE 519 says about it

IEEE 519 limits apply at the point of common coupling with the utility. When a standby generator supplies an islanded building, the building is cut off from that point, and the IEEE 519 limits don’t set the acceptance criteria for the generator bus. ABB makes the same point. If the generator ever runs in parallel with the utility, evaluate that mode separately.

That does not mean anything goes on generator power. ABB’s advice is to find the weakest link, the lower of the voltage distortion the connected equipment can stand and the distortion the generator maker allows, then run a harmonic study on generator power and design to keep voltage THD at or below that value. The note on IEEE 519 and drives covers how the standard works on utility power.

Sizing and mitigation

Generator sizing. ABB’s general guide for a generator feeding drives is 2 to 2.5 times the drive kVA for 6-pulse drives, and 1.5 to 2 times for regenerative drives with an active front end. ABB calls those multiples a general guide only, says the extra capacity can carry linear loads, and says to have the generator supplier do the real sizing. Cummins makes the same point from the other side: an oversized alternator can lower the subtransient reactance and improve harmonic performance, at the cost of higher fault current and more money, and generator sizing software is how to land on the right one.

Regen on a generator. A generator cannot take power back. If any drive on the generator bus can regenerate, the energy has to go to other loads on the bus or to a brake, so check that before a regenerative drive goes on generator power.

Drive options. ABB lists typical input current THD for the common choices in its HVAC harmonics guide:

  • 6-pulse drive with no reactor: 90 to 120 percent
  • 6-pulse with a 3 to 5 percent DC choke or AC reactor: 35 to 45 percent
  • 12-pulse: 10 to 12 percent
  • 18-pulse: 5 to 6 percent
  • Passive filter: 5 to 10 percent
  • Active filter: 4 to 7 percent
  • Active front end, ultra low harmonic: 3 to 5 percent

Those are typical values from that guide. ABB rates its ACH580-31 ultra low harmonic drive at 3 percent current THD or less, and other makers publish their own figures. Ultra low harmonic HVAC drives are a different thing from the regenerative drives in ABB’s sizing guide. The harmonic study on generator power decides which option the job needs on which drives.

Passive filters on a generator. This is the trap on generator power, and it has two parts.

  • Leading kVAR. ABB says passive filters are known to create a leading power factor at partial loads, and that generators can become unstable when loads draw a leading power factor current. Kohler warns that a purely capacitive filter can cause self-excitation and loss of voltage control. Cummins says the number to watch is leading VAR, not power factor, and recommends disconnecting power factor correction or filter capacitors at low load. ABB’s answer is a contactor that drops the filter’s capacitor banks at partial load, especially on filters that can be fed from a generator. Ask the generator supplier for the allowable leading kVAR at the loads the site will see, and check that the capacitor switching stays inside it. A data center at light IT load on day one is exactly the light load case.
  • Resonance. On a high impedance source like a generator, a passive filter can end up near a parallel resonance and raise voltage distortion instead of lowering it. The harmonic study should model the filters both in and out of circuit, on generator power.

Active filters. If the job has them, find out how they behave during a generator transfer, including any delay before they enable while voltage and frequency settle.

Load steps on the generator

Harmonics are only part of what drives do to a generator. When utility power fails and the load transfers to the generator, the cooling drives restart, and a few dozen of them starting at once is a big step load on a machine that just came online. The UPS adds its own: its rectifier is a constant power load, so its input current rises as voltage sags. Cummins points to UPS walk-in, where the UPS ramps its load onto the generator gradually, as one way to soften that step.

How often a drive can be powered up. Each outage cycles a drive’s input power at least twice, once on the transfer and once on the retransfer, and a transfer switch that hunts or a generator that trips and retries can stack several cycles in a few minutes. Drive makers limit how often the input can be switched on, because each power-up charges the DC bus capacitors through the precharge circuit. ABB says no more than five power-ups in ten minutes, and that more can damage the charging circuit. Danfoss rates the FC 102 at two power-ups a minute up to 7.5 kW, one a minute from 11 to 75 kW, and one every two minutes at 90 kW and up. Yaskawa’s GA700 manual says not to energize and de-energize the drive more often than once every 30 minutes. Check the limit for the drives on the job against the transfer switch’s retransfer and test timing, and use the switch’s delays to stop it from chattering.

For the drives, the tools are the restart delays and the ramps. Where the sequence staggers the restarts, the delays may live in the drives, the unit controllers or the BMS. The notes on CRAH units and the generator transfer and data center commissioning levels cover how to set and test them.

What to check on generator power

  • The study. Was the harmonic study run on generator power, with the drive load, the UPS and the actual generator data? Ask for the generator’s subtransient reactance, the voltage THD the study predicts, and the weakest link limit it designed to. Check that it modeled the filters in and out of circuit.
  • The drive options. Do the installed drives match what the study assumed: reactors, multi-pulse, filters or low harmonic drives?
  • Filter capacitors. If there are passive filters, how are the capacitors switched out at light load, and is that tested on generator power?
  • The measurement. During the integrated systems test, read voltage THD at the point the study names, the generator terminals or the cooling bus, with the cooling drives and the UPS running, not the fans alone. Take one reading at light load with the filters in circuit, which is the leading kVAR case and the one most likely to be skipped when the IST runs near full load bank. Take another at the highest expected drive and UPS load. Compare both with the study’s weakest link limit. A power quality meter built to a recognized measurement standard, such as IEC 61000-4-30, keeps the readings comparable.
  • Transients, separately. Trend generator voltage and frequency through the restarts. Steady state voltage THD and the transient dips during restarts are separate pass or fail checks, even when they are recorded in the same test.

When the BMS goes quiet

The other half of this note is the network, and it meets the generator half at the transfer. The drives power up just as the step load hits, and the BMS controllers or network switches that are not on UPS may still be rebooting. In a data center the BMS watches everything, and on some jobs it also sends the run commands and speed references. When the network drops, a controller reboots or a switch fails over, every drive that takes its orders over the network has to decide what to do. A drive that faults and stops on comm loss can take cooling away from a room that cannot spare it.

Some designs keep the network out of the control path. Danfoss describes a healthcare data center where the drives on the CRAC units report to the building automation system over Modbus TCP for monitoring and data collection only, with each CRAC unit controlled locally, to avoid the single point of failure a centralized control scheme would create. That is one answer. Where the BMS does control the drives, the comm loss setting is what keeps cooling running.

What the drives can do

The choices are similar across brands, with different names, and the settings depend on which communication path the drive uses:

  • ABB. On the ACS580, the fieldbus adapter path and the embedded fieldbus path each have their own comm loss settings. Both offer no action, a warning, a trip, freezing at the last speed, a safe speed reference set in the drive, and a Fault always choice. On the fieldbus adapter path the delay has a factory value of 0.3 seconds. On the embedded fieldbus path you also choose whether any message resets the timeout or only a write of the control word or a reference does. The ACH580 runs ABB’s HVAC control program, and on HVAC and data center jobs it often runs BACnet MS/TP on the embedded port, so check the ACH580’s own manual for the path in use.
  • Yaskawa. On the HV600, a communication error on the embedded Modbus or BACnet port can ramp the motor to stop, coast to stop, fast stop, raise an alarm only and keep running, or run at a preset speed, with an adjustable detection time and a setting that turns detection on or off. A communication option card has its own error setting with similar choices. Its bypass packages can continue at the last speed, continue at a preset speed, or stop with a fault.
  • Danfoss. On the FC 102, a control timeout time, set in seconds, triggers a timeout function chosen in the drive.

In a data center the usual answer is to keep cooling: hold the last speed, go to a preset speed, or hand control to a hardwired or local fallback. Each has a catch. Holding the last speed is only safe if that speed can carry the worst load expected before the network returns, and a drive frozen at a light night setpoint will not cover a load step. A preset speed has to be validated for the expected cooling demand with the equipment that will actually be running, because what works for one unit may not work when a whole group falls back together. A drive set to fault and stop on comm loss fails the test unless the sequence calls for it. Whatever the choice, it comes from the approved sequence, it is written down, and it is consistent across drives serving the same function, unless the sequence says otherwise.

The gotchas

  • The action may only fire if the network is in control. On ABB’s ACS580, the last speed, safe speed and normal fault actions apply when control or the reference is expected from the fieldbus. Its Fault always choice trips regardless of control source, and on the embedded fieldbus path the Warning choice also acts regardless, so a drive can surprise you in both directions. On Yaskawa’s HV600 with a communication option card, the option card error is detected when the run command or frequency reference is assigned to the card. A drive running on hardwired start and an analog speed reference may not react the way you expect when you pull its network cable, so know which control source each drive is on before the test.
  • BACnet needs a heartbeat. On Danfoss’s FC 102 under BACnet, the control timeout is only triggered when certain objects are written, and the FC 102’s BACnet documentation lists which ones. A BMS that only reads the drive will never trip it. If the BMS commands the drive over BACnet, it has to rewrite those objects on a schedule inside the timeout window, even when the speed isn’t changing, so that a dead BMS trips the timer. The same idea applies to ABB’s embedded fieldbus setting where only control word or reference writes reset the timeout.
  • The first 60 seconds. For the first 60 seconds after power-up, ABB’s ACS580 does not monitor for communication loss. If the network takes longer than that to come back after an outage, the drive’s comm loss timer starts after the window ends.
  • The timeout is a window. It has to ride through the interruptions the sequence is meant to tolerate, such as a controller reboot or a switch failover. It also has to expire before a stale command becomes a problem. Find out how long the controllers and switches take to come back. If the ride-through time is longer than a stale command can be tolerated, no timer setting fixes it, and the design needs a local or hardwired fallback.
  • The approved fire and smoke control sequence takes priority over the comm loss fallback. Some sequences need a fan to stop, such as on a clean agent release. Smoke control may need a fan to run. A comm loss setting that holds the last speed must not override either one. Designs can require the fire interlock to be hardwired into the drive or the unit for exactly that reason, so physically verify it. The note on fire mode and smoke control override covers the drive side.

Keep the network healthy

A comm loss event often starts as a wiring or setup problem on the network. ABB’s RS-485 troubleshooting note for BACnet MS/TP cites a BACnet guide specification recommendation of no more than 32 devices on each MS/TP segment. That is separate from the electrical limit, which depends on the unit load of each transceiver. The note also says to set the baud rate manually when the link’s rate is known, and that the shield should run continuous but be grounded at one end only, preferably at the supervisory controller. It lists the usual causes: interference from poor shielding or grounding, duplicate or default addresses, a single device at the wrong baud rate taking the whole link offline, reversed polarity, and too many unit loads on one link. The notes on ACH580 BACnet MS/TP setup and VFD communication faults go through the diagnosis, and Is Fieldbus Less Reliable Than Hardwired Control? covers the design choice.

Test it

Under the commissioning agent’s approved script, with the limits agreed first:

  1. Confirm which control source and which communication path each drive is on: network, hardwired or local, and which port.
  2. With the unit running, break communication the way the script calls for: pull the cable, disable the port, or reboot the controller. Watch the drive through the timeout and confirm it does exactly what the sequence says.
  3. With the link still up, stop the controller from updating the drive, for example by stopping its program. Pulling a cable does not prove this case, and it is the one the BACnet heartbeat is for.
  4. Power the drive up with the BMS already absent. This is the real outage case: utility fails, the generator picks up, the drives restart, and controllers or switches without UPS backing are not back yet. Confirm cooling starts the way the sequence intends.
  5. Restore communication and confirm the drive returns to normal control without a manual reset, unless the sequence calls for one, and without an unexpected speed step or an out of sequence restart.
  6. With a drive in its comm loss fallback, trigger the fire and smoke control inputs and prove the outcome the sequence requires, stop or run.

Before you leave the site

Record, for the cooling drives on generator power and on the network:

  1. The harmonic study basis on generator power, the weakest link voltage THD limit, whether the filters were modeled in and out, and the drive harmonic options installed.
  2. How passive filter capacitors are switched at light load, the generator’s allowable leading kVAR, and the test result.
  3. Voltage THD measured during the IST, where it was measured, with which loads running, at light load with the filters in and at the highest expected load, and the meter used.
  4. Generator voltage and frequency through the restarts, recorded as a separate check from steady state THD.
  5. Active filter behavior during the transfer, if the job has them, and each drive’s power-up limit checked against the transfer switch timing.
  6. Each drive’s control source, communication path, comm loss action, timeout and timeout reset mode, and the results of each comm loss test, including power-up with the BMS absent and the stalled controller case.
  7. The heartbeat the BMS writes, where the drive needs one, and its interval against the timeout.
  8. The network layout, device count per segment, baud rate, addresses and shield grounding point.

Comm loss and restart setup on the ACH580 is covered in the ABB 580 start-up class at The Tolbert School. Other brands handle these differently, so check the manual for the drive on your job. The data center drives guide covers the rest of the drive work in a data center.

Frequently Asked Questions

Why do VFDs cause more distortion on a generator than on utility power?

Voltage distortion depends on the harmonic current and the impedance of the source it flows through, and a generator is a much weaker source than a utility transformer. In one modeled case on a Cummins data center slide, a 6-pulse load at 29 percent current THD makes about 2.8 percent voltage THD on a stiff transformer and about 34 percent on a generator with 12 percent subtransient reactance. The real number on a job depends on the generator, how heavily the drive load loads it, and the drives.

Does IEEE 519 apply when a building is running on its own generator?

IEEE 519 limits apply at the point of common coupling with the utility. When a standby generator supplies an islanded building, those limits don't set the acceptance criteria for the generator bus. Set those criteria from the generator maker's limits and the connected equipment's tolerance, whichever is lower, and evaluate any mode where the generator runs in parallel with the utility separately.

Can a harmonic filter cause problems on a generator?

Yes. Passive filters can draw leading kVAR at light load, and a generator can become unstable or lose voltage control when its load is leading. A passive filter on a high impedance source can also sit near a resonance and raise voltage distortion. ABB recommends a contactor that drops the filter capacitors at partial load, and Cummins recommends disconnecting power factor correction or filter capacitors at low load.

What should a cooling drive do when it loses communication with the BMS?

Whatever the approved sequence says. In a data center that usually means keep cooling: hold the last speed, go to a preset speed validated for the expected cooling demand, or hand control to a hardwired or local fallback. The timeout has to ride through the interruptions the sequence tolerates and expire before a stale command becomes a problem, and the whole thing gets proven with comm loss tests at commissioning, including power-up with the BMS already gone.

Why didn't my drive react when I pulled the network cable?

Often because the drive was not taking its run command or speed reference from the network. On ABB's ACS580, the last speed, safe speed and fault actions apply when control or the reference is expected from the fieldbus, while its Fault always and Warning choices act regardless. On Yaskawa's HV600 with a communication option card, the option card error is detected when the run command or frequency reference is assigned to the card. On Danfoss's FC 102 under BACnet, the control timeout is only triggered by writes to certain objects. And ABB's ACS580 does not monitor for comm loss during the first 60 seconds after power-up.

Online start-up courses, filmed on real drives

One drive per course, filmed uncut with a clock on screen from first power to a saved backup. The install course is free, and the ABB ACS380 and ACS580 start-up course is open now.

See the online courses

Wayward Leaders® is a veteran-owned VFD training practice. We teach maintenance teams and plant electricians to install, commission, and troubleshoot variable frequency drives correctly.

Every class ends with a scored competency assessment. The plant gets a way to prove what each technician can do, not a roster of who sat in the room.

The instruction is field-trained. It is drawn from nearly 8,000 VFD, power, and motor documents and from more than 750 commissioned drives captured through personal field experience and data collection. Carl Lee Tolbert, PhD, CMRP, and ATD Master Trainer™, leads it. He has delivered more than 5,000 hours of VFD instruction across 30 years and trained 8,000 industrial professionals, from International Paper to the U.S. Navy.

The premise is simple: VFDs do not fail. Installations fail them. The curriculum is built backward from that.

Installation, commissioning, troubleshooting, and fault diagnosis guides are published openly at waywardleaders.com.